The Brewery is Complete!

We have completed the actual brewery build. It has been an eight-month process from the time the controller kit was ordered to the final bit of assembly on the heat-exchanger but we are now ready for testing.
photo
The testing process will happen in my garage, where we will power up the control box (shown above) and work it through it's paces.
IMG_1746
We will then conduct test brews with water only to check the overall integrity of the system and to check if all the components are working correctly. All we need now is a power source. That will hopefully be wired in this week. Can't wait to crank this baby up!